Zoning-Building Department
- Zoning-Building Permit Application
- Zoning Violation/Complaint Form
- Electrical Permit Application
- Plumbing Permit Application
- Gas Piping Permit Application
- HVAC Permit Application
- Demolition Permit Application
- Totem Pole Zoning Permit Application
- Private Road Acknowledgement
- Temporary Camping Permit Application
- Residential Energy Code Application
- Solar System Requirements: (Please reference Freedom Zoning Ordinance, Article 22 – Solar Installations)
- Roof Mounted System-
- Must complete Building and Electrical Permit from above.
- Requires a structural engineer report stamped by a licensed professional engineer confirming roof can handle the load.
- A site plan showing array location
- Manufacturer’s installation instructions
- Ground or Pole Mount System –
- Must go before the Planning Board for a Conditional Use Permit
- Roof Mounted System-
- Propane Appliance Permit
- Oil Burner Application (includes wood/pellet burning furnace applications) – Must be obtained from the Fire Chief (call 603-539-4261)
- Please note, installation or replacement of oil furnaces requires a permit from the Fire Chief
